Complete thermal systems, proven at the flame.

ThermoSys engineers the whole thermal asset. Burners, boilers, gas trains and combustion equipment, sized for the duty, matched to the fuel and commissioned against measured flue-gas results. Not a catalogue sale. A system that has to earn its keep every shift.

From Fuel Line to Steam Header.

Every thermal scope is carried by one team, so the burner, the gas train and the controls are never three different companies pointing at each other.

THM-01

Burner selection and matching

The right burner for the duty and the fuel, sized for turndown that is actually achievable on your load profile.

THM-02

Boilers and thermal process equipment

Steam, hot water and process heat plant specified and integrated as complete, controllable systems.

THM-03

Gas trains and fuel systems

Fuel delivery engineered and documented, from supply to burner inlet, across gas, LPG and oil.

THM-04

Multi-fuel and conversions

Dual and multi-fuel systems, plus HVO and biodiesel conversions on existing plant.

THM-05

Commissioning and tuning

Cold and hot commissioning, combustion curves set with flue-gas analysis, load testing and sign-off.

THM-06

Re-rating and refurbishment

Existing burners re-rated and older thermal plant brought back to safe, efficient duty.

Follow the fuel from the fence to the process.

A thermal system is a chain of decisions, and every link is an engineering job. ThermoSys carries the whole path, so efficiency is designed in rather than hoped for.

01

Fuel Supply

Gas · LPG · Oil

02

Gas Train

Regulate · Prove

03

Burner

Fire · Turn Down

04

Boiler / Furnace

Transfer Heat

05

Process Demand

Steam · Hot Water

06

Flue

Measure · Analyse

07

Tuning

Curves · Trim

08

Measured Performance

Verify · Report

Efficiency design in, not hoped for

A burner is only as good as the day it was commissioned.

Cold checks before fuel

A burner is only as good as the day it was commissioned. So we treat that day like the product. Follow one first firing on a new installation and watch what structured, documented commissioning looks like.

  1. 06:30
    Cold commissioning

    Checks before any fuel flows

    Interlocks, valve proving, instrument loops and safety chains verified while the plant is cold and safe.

  2. 08:15
    First light-off

    Ignition proven, flame supervised

    Pilot and main flame established under supervision, with the burner management system doing exactly what the drawings say.

  3. 10:40
    Curve setting

    Combustion tuned point by point

    Fuel and air set across the whole firing range with flue-gas analysis at every point, not two points and a guess.

    3.1% Flue 02
  4. 13:20
    Load Testing

    Proven against real demand

    The system run at the loads the plant actually needs, turndown confirmed, response verified.

  5. 15:00
    Handover

    Documentation, training, sign-off

    Curves, settings and test records handed over, operators walked through the system by the engineer who set it up.

The flame is the start of the relationship, not the end of the job.

Thermal plant drifts. Fuel changes, loads change, heat surfaces foul. ThermoSys stays connected to the systems it commissions, so performance is maintained rather than remembered.

Explore Connected Support
Monitor Watched between visits

Live plant data and exception alerts on supported systems, so drift is seen before it becomes a breakdown.

Maintain Planned, evidence-based service

Maintenance scheduled against operating data and combustion checks, not just the calendar.

Improve Re-tuned as the plant changes

Curves revisited when fuels, loads or equipment change, with results measured against the original baseline.

Proven from design through commissioning

Industrial automation and combustion control equipment

One team

Burner and controls, one accountability

The people who size the burner also engineer the panel and the logic. Nothing falls between a supplier and a contractor.

Engineer commissioning an industrial control system on site

On the tools

Specified by commissioning engineers

Our background is service and start-up, so we specify for turndown that works, interlocks that pass audit and maintenance at three in the morning.