Panels that Pass Inspection with the Door Open

A control panel is the one place where every discipline meets. Power, control, safety and communications, terminated side by side. ThermoSys designs, builds, tests and documents panels in-house, so what leaves the workshop is exactly what the drawings promise.

From single enclosure to complete MCC line.

Every panel scope stays in one workshop and one set of hands, from the general arrangement drawing to the factory acceptance test.

PNL-01

Panel design and drawings

General arrangements, schematics and termination schedules produced before a single wire is cut.

PNL-02

Control panels

PLC, HMI and instrumentation panels built on engineered enclosure infrastructure, with Rittal systems as the backbone.

PNL-03

Motor control centres

MCCs and drive panels with power distribution, VSDs and protection coordinated as one system.

PNL-04

Wiring and termination

Ferruled, labelled, routed and dressed to standard, so fault-finding takes minutes rather than shifts.

PNL-05

Testing and FAT

Point-to-point testing on every panel, functional testing against the schematics, and witnessed FAT where required.

PNL-06

Installation and site integration

Delivery, installation supervision and termination to field, carried by the same team that built the panel.

One panel, one paper trail, no surprises.

A good panel is a sequence of checkpoints. ThermoSys runs every build through the same disciplined path, so quality is a process rather than a hero effort.

01

Specification

Duty · Standards

02

Design

GA · Schematics

03

Enclosure

Rittal Build-up

04

Population

Gear · Rails · Trunking

05

Wiring

Ferrule · Label · Dress

06

Testing

Point to Point

07

FAT

Function · Witness

08

Site Integration

Install · Terminate

Simplified build sequence

Open any of our panels and read the story.

Segregated power and control

Workmanship is not decoration. Every detail inside the enclosure has a job on the worst day of the plant's life. Walk the inside of a ThermoSys panel from top to bottom.

  1. TOP
    Incomer and Distribution

    Power that can be worked on safely

    Incomer, isolation and distribution arranged for safe access, with protection sized and coordinated, not copied.

  2. MID
    Control and logic

    PLC, relays and I/O in clean rows

    Control gear laid out to the drawings, with room to test, replace and extend without surgery.

  3. WIRE
    The wiring itself

    Ferruled, labelled, routed, dressed

    Every core identified at both ends and every route deliberate. This is the difference between a two-minute fix and a two-hour hunt.

    100% Tested
  4. LOW
    Marshalling and field

    Terminals that make site work easy

    Field terminations marshalled and labelled to the schedules, so site wiring lands once and lands right.

  5. DOOR
    Documentation

    The as-built lives with the panel

    Drawings, test records and settings in the door pocket and in your inbox. Ten years from now, both still match the panel.

The cheapest panel is the one nobody fights with for a decade.

Panels are judged years after the invoice, at midnight, by an electrician who has never seen the plant. We build for that person.

Explore Industrial Automation
Servicable Designed for the fault-finder

Logical layout, honest labelling and access to test points, so diagnosis is reading, not archaeology.

Documented As-built or it did not happen

Every change during build and commissioning captured, so drawings and reality never drift apart.

Extendable Room to grow left on purpose

Spare ways, spare I/O and spare space specified up front, because plants never shrink.

The panel builder who also writes the logic.

Industrial automation and combustion control equipment

One team

Panel, program and plant in one scope

The builders sit next to the programmers. Terminal changes, I/O moves and logic updates happen in one conversation.

Engineer commissioning an industrial control system on site

Proven

Tested before it travels

Point-to-point and functional testing in the workshop means site commissioning confirms the panel rather than debugging it.